Electrician · Dothan, AL
Electrician license requirements in Dothan, Alabama
Everything an electrician needs to work legally in Dothan: the Alabama state rule and the local license. Checked November 7, 2026 from 9 official sources.
What does an electrician need to work in Dothan?
You need two licenses: one from Alabama and one from Dothan.
Alabama state license · required
Electrical Contractor license; Journeyman Electrician license
Dothan license · required
Contractor business license
- Dothan fee
- Not published
- Dothan bond
- None listed
- Alabama bond
- None listed
- Insurance
- Not listed
Steps to work as an electrician in Dothan
- 1
Get the Alabama Electrical Contractor license; Journeyman Electrician license
The board's rules and pages reviewed do not set a dollar threshold.6
More
An electrical contractor license in Alabama is unlimited in voltage and bid amount.
- 2
Apply for your Dothan license
Contractor business license Bring the bond and insurance certificate.
- 3
Pull a permit for each job
A permit must be obtained by a contractor licensed to work in the City of Dothan unless the property owner is doing the work.9
More
A licensed contractor may name representatives to pull permits under the license by filing an affidavit, renewed each year. Permits can be submitted online.
Dothan license details
Contractor business license General contractorResidential builderElectricianPlumberHVAC contractorRoofer Fee— Bond—
Who needs it
What you need
General contractors need an Alabama Licensing Board for General Contractors license; home builders a Home Builders Licensure Board license; roofers a Home Builders Licensure Board roofers license.1
Electrical contractors need an Alabama Electrical Contractors Board license.1
More
A provisional license may be accepted if Dothan is listed as the authorized locality; a journeyman license is not accepted.
Plumbers need a master plumbing license and gas fitters a master gas fitter license from the Alabama Plumbers and Gas Fitters Examining Board. Apprentice and journeyman licenses are not accepted.1
Mechanical/HVAC and refrigeration contractors need the matching license from the Alabama Board of Heating, Air Conditioning and Refrigeration Contractors. An apprentice license is not accepted.1
Subcontractors do not need a state certification. The city subcontractor license covers general building work only, up to $9,999 residential, $2,499 residential roofing and $49,999 commercial per job, and does not allow trade work that needs a state certification.1
Contractors should contact the Business License Division before beginning jobs inside the city limits.3
Fees and bond
Every contractor type must provide a surety bond. The city emails the bond form, and the signed bond must reach the Business License Division before the license is issued. The amount is not stated.
Building contractors must get a City of Dothan business license and also get construction permits from Building Inspection Services. A Houston County license may also be required.2
Alabama rules in short
State license
Electrical Contractor license; Journeyman Electrician license. Full Alabama requirements
Job size limit
The board's rules and pages reviewed do not set a dollar threshold.6
More
An electrical contractor license in Alabama is unlimited in voltage and bid amount.
Hiring an electrician in Dothan?
What to ask for
A current Alabama Electrical Contractor license; Journeyman Electrician license, the Dothan contractor business license.
Doing the work yourself
A property owner may get a permit if the owner is doing the work.9
Sources
9 official pages, checked November 7, 2026
- City of Dothan Business License Application · City of Dothan · checked 2026-11-07
- Business License · City of Dothan · checked 2026-11-07
- Privilege License Procedure and Checklist · City of Dothan · checked 2026-11-07
- How to Get Licensed · Alabama Board of Electrical Contractors · checked 2026-11-06
- License Search · Alabama Board of Electrical Contractors · checked 2026-11-06
- Chapter 303-X-3 Licensing and Fees · Alabama Administrative Code (Legislative Services Agency) · checked 2026-11-06
- Code of Alabama Section 34-36-9 Failure to Renew License; Restoration Fee; New License · Alabama Legislature · checked 2026-11-06
- Code of Alabama Section 34-36-7 Examinations; Reciprocity with Other States; Issuance of Licenses · Alabama Legislature · checked 2026-11-06
- Permit Requirements · City of Dothan · checked 2026-11-07
Rules change. Confirm with the agency before you bid or start work. How we research