licenserules

Pest control · Opelika, AL

Pest control license requirements in Opelika, Alabama

Everything a pest control needs to work legally in Opelika: the Alabama state rule and the local license. Checked November 7, 2026 from 11 official sources.

What does a pest control need to work in Opelika?

You need two licenses: one from Alabama and one from Opelika.

1

Alabama state license · required

Structural Professional Services permit (HPC, FC, WDC categories) with a certified operator

Details
2

Opelika license · required

Contract work license

Opelika fee
$12
Opelika bond
$5,000
Alabama bond
None listed
Insurance
Not listed

Steps to work as a pest control in Opelika

  1. 1

    Get the Alabama Structural Professional Services permit (HPC, FC, WDC categories) with a certified operator

    No dollar threshold. A permit is needed before doing or soliciting structural pest control work, which includes control of insects, rodents, pest animals, fungi and wood-destroying organisms in structures, and fumigation.67

    Exams, experience and state fees

  2. 2

    Get your surety bond

    $5,000

    Opelika requires a $5,000 bond for this license.12

    You pay a yearly premium, not the full bond amount. Estimate the cost

  3. 3

    Apply for your Opelika license

    $12

    Contract work license: $12 issuance fee included in each license price.1 Bring the bond and insurance certificate.

    What the application needs

  4. 4

    Pull a permit for each job

    Any construction needs a building permit plus electrical, plumbing and mechanical permits.91011

    More

    Electrical, plumbing and mechanical contractors must call for their own permits. The residential permit application asks for the general contractor's state license number. Permits are handled through the city's EnerGov self-service portal.

    Open the permit portal

Opelika license details

Contract work license General contractorResidential builderElectricianPlumberHVAC contractorLandscaperPest control Fee$12 Bond$5,000

Who needs it

Contractors and subcontractors doing work inside Opelika city limits.12

More

1099 workers (for example subcontractors) must get their own City of Opelika business license.

What you need

  • Plumbing, electrical, heating and air conditioning, landscaping, refrigeration, gas fitting and extermination contractors must present a State of Alabama license certificate or card.1

  • The application asks for the state license number and lists general contractor, home building, electrical, plumbing/gas fitting, HVAC and landscaping as categories that may need added permits or licenses.2

  • A business that uses 1099 workers must list each worker's name, address and phone number.2

Fees and bond

Issuance fee included in each license price1$12
Bond12$5,000

Electrical and plumbing contractors must have a $5,000 surety bond, bought before starting a contract.

Renewal

Licenses expire December 31 and are due January 1. They are delinquent after February 15, with a penalty of 10% of the tax due plus 5% for each further 30 days.3

More

A contractor expecting no Opelika work can ask to inactivate the license to avoid a penalty.

Apply on the official site
Business license

A business license is needed for sales or services inside Opelika city limits.12

More

Contractors and subcontractors on projects that need no permit pay a fee of one-fourth of one percent when the license is due. The city also has an occupational tax of 1.5% of wages for people working in the city.

Alabama rules in short

State license

Structural Professional Services permit (HPC, FC, WDC categories) with a certified operator. Full Alabama requirements

Job size limit

No dollar threshold. A permit is needed before doing or soliciting structural pest control work, which includes control of insects, rodents, pest animals, fungi and wood-destroying organisms in structures, and fumigation.67

State bond

The department lists a form titled Termites - Bond to Perform Subterranean Work. The pages reviewed do not state the bond amount.4

State liability insurance

The department lists a Certificate of Structural Insurance form for structural licenses. The pages reviewed do not state the required coverage amount.4

Hiring a pest control in Opelika?

What to ask for

A current Alabama Structural Professional Services permit (HPC, FC, WDC categories) with a certified operator, the Opelika contract work license.

Check an Alabama license

Sources

11 official pages, checked November 7, 2026
  1. Business License Information · City of Opelika · checked 2026-11-07
  2. Business License and Tax Registration Application · City of Opelika Revenue Department · checked 2026-11-07
  3. Business License Renewal · City of Opelika · checked 2026-11-07
  4. Professional Services · Alabama Department of Agriculture and Industries, Pesticide Management Section · checked 2026-11-06
  5. Pesticide Applicator Search Services · Alabama Department of Agriculture and Industries, Pesticide Management Section · checked 2026-11-06
  6. Code of Alabama Section 2-28-1 Definitions · Alabama Legislature · checked 2026-11-06
  7. Code of Alabama Section 2-28-4 Permits; Statements as to Training and Experience of Applicants; Examination · Alabama Legislature · checked 2026-11-06
  8. Commercial Applicators · Alabama Department of Agriculture and Industries, Pesticide Management Section · checked 2026-11-06
  9. Building Inspection Division · City of Opelika · checked 2026-11-07
  10. Residential Building Permit Process · City of Opelika · checked 2026-11-07
  11. Residential Building Permit Application · City of Opelika · checked 2026-11-07

Rules change. Confirm with the agency before you bid or start work. How we research