Electrician · Chicago, IL
Electrician license requirements in Chicago, Illinois
Everything an electrician needs to work legally in Chicago: the Illinois state rule and the local license. Checked November 6, 2026 from 13 official sources.
What does an electrician need to work in Chicago?
You need one license, from Chicago. Illinois has no state license for this trade.
Chicago license · required
Electrical contractor license (general or low voltage)
- Chicago fee
- $150
- Chicago bond
- None listed
- Illinois bond
- None listed
- Insurance
- Not listed
Steps to work as an electrician in Chicago
- 1
Apply for your Chicago license
$150Electrical contractor license (general or low voltage): $150 electrical contractor license or renewal (2026).1 Bring the bond and insurance certificate.
- 2
Pull a permit for each job
For plan-based building permits, the applicant is the property owner or an authorized tenant, and the application must be prepared and submitted by an Illinois-licensed architect or engineer or a city-licensed expediter.78
More
Any general contractor overseeing the work must be Chicago-licensed and named on the application. Anyone doing electrical, elevator, mason, plumbing or sewer work must be named and Chicago-licensed. Smaller repair and replacement work goes through the Express Permit Program.
Chicago license details
Electrical contractor license (general or low voltage) Electrician Fee$150 Bond—
Who needs it
Anyone who installs, alters or maintains wiring or equipment covered by the Chicago Electrical Code, including lighting, communication and alarm systems, whether or not a permit is needed.1
More
Public utility work and State-licensed private alarm contractors acting within their license are exempt.
What you need
The business must employ at least one licensed supervising electrician.1
More
The license type (general or low voltage) follows the exam that supervising electrician passed.
A supervising electrician must be at least 21, have at least 2 years of electrical experience under a supervising electrician or equivalent (verified by letters from supervisors), and pass a written exam. Someone who fails must wait at least 6 months to reapply.2
Work may be done only by the business's employees under a supervising electrician, not by workers paid as independent contractors.1
More
On Class 1 work (buildings over 55 feet or large assembly spaces before occupancy), each worker must be a supervising electrician or a current or graduated DOL-recognized apprentice of at least 8,000 hours.
Apply through Continental Testing Services.1
Fees and bond
Renewal
Valid for one year. Renew through the Department of Buildings web portal; an expired license may be renewed only within three years.1
More
The license is inactivated if no valid supervising electrician is linked to it.
Illinois rules in short
State license
No state license. Cities or counties may license it. Full Illinois requirements
Hiring an electrician in Chicago?
What to ask for
the Chicago electrical contractor license (general or low voltage).
Doing the work yourself
An individual does not need a general contractor license for work (other than excavation and demolition) at their primary residence if the building is three or fewer stories, has six or fewer units and has no nonresidential use; this may be claimed for one property per calendar year.91011
More
The owner, occupant or lessee of a single-family home may do their own plumbing without a plumbing license, but may not hire anyone other than a licensed plumbing contractor. A similar primary residence exception applies to mason work.
Sources
13 official pages, checked November 6, 2026
- Electrical Contractor License · City of Chicago Department of Buildings · checked 2026-11-06
- Supervising Electrician License · City of Chicago Department of Buildings · checked 2026-11-06
- Illinois Municipal Code (65 ILCS 5), full text · Illinois General Assembly · checked 2026-11-06
- Bill Status of SB2307, 104th General Assembly (Electrician Licensing Act) · Illinois General Assembly · checked 2026-11-06
- IDFPR | Professions and Industries Regulated by IDFPR · Illinois Department of Financial and Professional Regulation · checked 2026-11-06
- 83 Ill. Adm. Code Part 468, Distributed Generation Installer Certification · Illinois General Assembly, Joint Committee on Administrative Rules · checked 2026-11-06
- Plan-Based Building Permits: General Terms and Conditions · City of Chicago Department of Buildings · checked 2026-11-06
- Building Permit Application Instructions · City of Chicago Department of Buildings · checked 2026-11-06
- General Contractor License · City of Chicago Department of Buildings · checked 2026-11-06
- Plumbing Contractor License · City of Chicago Department of Buildings · checked 2026-11-06
- Mason Contractor License · City of Chicago Department of Buildings · checked 2026-11-06
- Construction and Repair · City of Chicago Department of Business Affairs and Consumer Protection · checked 2026-11-06
- Home Repair · City of Chicago Department of Business Affairs and Consumer Protection · checked 2026-11-06
Rules change. Confirm with the agency before you bid or start work. How we research