Solar installer · Joliet, IL
Solar installer license requirements in Joliet, Illinois
Everything a solar installer needs to work legally in Joliet: the Illinois state rule and the local license. Checked November 10, 2026 from 5 official sources.
What does a solar installer need to work in Joliet?
You need two licenses: one from Illinois and one from Joliet.
Joliet license · required
Contractor registration
- Joliet fee
- $100
- Joliet bond
- None listed
- Illinois bond
- None listed
- Insurance
- Proof required
Steps to work as a solar installer in Joliet
- 1
Get the Illinois Distributed Generation Installer Certification
Since December 31, 2013, every entity that installs distributed generation (such as solar) in Illinois must be certified by the Illinois Commerce Commission before installing.3
More
A person installing a system on their own property for their own use without help is exempt.
- 2
- 3
Apply for your Joliet license
$100Contractor registration: $100 hvac annual registration after passing the city hvac exam.2 Bring the bond and insurance certificate.
- 4
Pull a permit for each job
Joliet license details
Contractor registration General contractorResidential builderElectricianPlumberHVAC contractorRooferDemolition contractorConcrete contractorSolar installer Fee$100 Bond—
Who needs it
Any contractor doing work under a permit in the city, including general contractors, subcontractors (electrical, plumbing, HVAC) and specialty contractors such as fire alarm, fire suppression, elevator, refrigeration, roofing, demolition, siding, generator, solar/EV charging and right-of-way or concrete work.12
What you need
Plumbing contractors need the State of Illinois (IDPH) plumbing contractor license; a copy of the physical license is required.1
More
Roofing contractors need the Illinois unlimited roofing license, or a limited license for residential projects of 8 units or fewer.
Siding contractors need VSI certification. Fire sprinkler, fire alarm and elevator contractors need the matching State of Illinois license.1
Fees and bond
Only some contractor types: demolition contractors need a $50,000 wrecking bond, and contractors working in the public right-of-way (utilities, excavation, concrete) need a $10,000 street obstruction bond.
More
Bonds name the City of Joliet as obligee and must stay active for the permitted work.
Insurance
Renewal
Registrations must be current and valid when the permit is issued.2
Illinois rules in short
State license
Distributed Generation Installer Certification. Full Illinois requirements
Job size limit
Since December 31, 2013, every entity that installs distributed generation (such as solar) in Illinois must be certified by the Illinois Commerce Commission before installing.3
More
A person installing a system on their own property for their own use without help is exempt.
Hiring a solar installer in Joliet?
What to ask for
A current Illinois Distributed Generation Installer Certification, the Joliet contractor registration, and a certificate of insurance.
Sources
5 official pages, checked November 10, 2026
- Contractor Registration Guide · City of Joliet Community Development Services · checked 2026-11-10
- Building Code and Contractor Information · City of Joliet · checked 2026-11-10
- 83 Ill. Adm. Code Part 468, Distributed Generation Installer Certification · Illinois General Assembly, Joint Committee on Administrative Rules · checked 2026-11-06
- Building & Inspections · City of Joliet · checked 2026-11-10
- Residential Building Permit Information · City of Joliet · checked 2026-11-10
Rules change. Confirm with the agency before you bid or start work. How we research