licenserules

Electrician · Olympia Fields, IL

Electrician license requirements in Olympia Fields, Illinois

Everything an electrician needs to work legally in Olympia Fields: the Illinois state rule and the local license. Checked November 6, 2026 from 8 official sources.

What does an electrician need to work in Olympia Fields?

You need one license, from Olympia Fields. Illinois has no state license for this trade.

1

Olympia Fields license · required

Contractor's license

Olympia Fields fee
$100
Olympia Fields bond
None listed
Illinois bond
None listed
Insurance
Proof required

Steps to work as an electrician in Olympia Fields

  1. 1

    Get a certificate of insurance

    General liability of $500,000, property damage of $50,000 and statutory workers' compensation, with the village as additional insured and certificate holder.12

    More

    A contractor with no employees may sign a statement instead of showing workers' compensation.

  2. 2

    Apply for your Olympia Fields license

    $100

    Contractor's license: $100 annual fee (waived for plumbers with a valid state plumber's license).12 Bring the bond and insurance certificate.

    What the application needs

  3. 3

    Pull a permit for each job

    A permit is needed before building, altering, repairing or improving any structure.138

    More

    Applications need a work order or proposal signed by the contractor and owner and are emailed as a complete packet to permits@olympia-fields.com. The permit application lists each contractor's village license number. Contractors are responsible for scheduling inspections.

Olympia Fields license details

Contractor's license General contractorResidential builderElectricianPlumberHVAC contractorRoofer Fee$100 BondNone

Who needs it

All contractors and subcontractors, including general, electrical, plumbing and HVAC contractors.12

What you need

  • A complete application with all documents attached, emailed to the village. Incomplete applications are not accepted.23

  • Plumbers, roofers and irrigation contractors attach a copy of their current state license.12

    More

    Electricians attach a copy of an electrical license from a testing community.

Fees and bond

Annual fee (waived for plumbers with a valid state plumber's license)12$100
Bond2None

The application states that a bond is not required.

Insurance

General liability of $500,000, property damage of $50,000 and statutory workers' compensation, with the village as additional insured and certificate holder.12

More

A contractor with no employees may sign a statement instead of showing workers' compensation.

Renewal

The license is valid for one year from the date it is issued.1

Apply on the official site

Illinois rules in short

State license

No state license. Cities or counties may license it. Full Illinois requirements

Hiring an electrician in Olympia Fields?

What to ask for

the Olympia Fields contractor's license, and a certificate of insurance.

Check an Illinois license

Doing the work yourself

A homeowner may do building, plumbing, HVAC and electrical work on a home they live in, or will live in for at least six months after final approval, by signing a notarized waiver.8

More

If inspections show the work does not meet code, the homeowner must hire a licensed contractor to fix and finish it.

Sources

8 official pages, checked November 6, 2026
  1. Building Department · Village of Olympia Fields · checked 2026-11-06
  2. Contractor's License Application · Village of Olympia Fields · checked 2026-11-06
  3. Forms · Village of Olympia Fields · checked 2026-11-06
  4. Illinois Municipal Code (65 ILCS 5), full text · Illinois General Assembly · checked 2026-11-06
  5. Bill Status of SB2307, 104th General Assembly (Electrician Licensing Act) · Illinois General Assembly · checked 2026-11-06
  6. IDFPR | Professions and Industries Regulated by IDFPR · Illinois Department of Financial and Professional Regulation · checked 2026-11-06
  7. 83 Ill. Adm. Code Part 468, Distributed Generation Installer Certification · Illinois General Assembly, Joint Committee on Administrative Rules · checked 2026-11-06
  8. Building Permit and Owner Waiver · Village of Olympia Fields · checked 2026-11-06

Rules change. Confirm with the agency before you bid or start work. How we research