Solar installer · Skokie, IL
Solar installer license requirements in Skokie, Illinois
Everything a solar installer needs to work legally in Skokie: the Illinois state rule and the local license. Checked November 6, 2026 from 5 official sources.
What does a solar installer need to work in Skokie?
You need two licenses: one from Illinois and one from Skokie.
Skokie license · required
Solar contractor registration
- Skokie fee
- $100
- Skokie bond
- None listed
- Illinois bond
- None listed
- Insurance
- Proof required
Steps to work as a solar installer in Skokie
- 1
Get the Illinois Distributed Generation Installer Certification
Since December 31, 2013, every entity that installs distributed generation (such as solar) in Illinois must be certified by the Illinois Commerce Commission before installing.3
More
A person installing a system on their own property for their own use without help is exempt.
- 2
Get a certificate of insurance
A certificate of insurance showing commercial general liability coverage of at least $1,000,000 per occurrence, with the Village of Skokie named as an additional insured.1
- 3
Apply for your Skokie license
$100Solar contractor registration: $100 solar contractor registration (general contractor fee).1 Bring the bond and insurance certificate.
- 4
Skokie license details
Solar contractor registration Solar installer Fee$100 Bond—
Who needs it
Solar contractors.1
What you need
A current electrical license from a testing community.1
Fees and bond
When a project has only one contractor or no general contractor, those contractors must be registered and provide a surety bond. The registration form does not state a bond amount.
Insurance
A certificate of insurance showing commercial general liability coverage of at least $1,000,000 per occurrence, with the Village of Skokie named as an additional insured.1
Renewal
The village says many contractors must be registered and insured each year, and registration and insurance must stay current through final inspection.2
Illinois rules in short
State license
Distributed Generation Installer Certification. Full Illinois requirements
Job size limit
Since December 31, 2013, every entity that installs distributed generation (such as solar) in Illinois must be certified by the Illinois Commerce Commission before installing.3
More
A person installing a system on their own property for their own use without help is exempt.
Hiring a solar installer in Skokie?
What to ask for
A current Illinois Distributed Generation Installer Certification, the Skokie solar contractor registration, and a certificate of insurance.
Sources
5 official pages, checked November 6, 2026
- Application for Contractor Registration · Village of Skokie · checked 2026-11-06
- Selecting a Contractor · Village of Skokie · checked 2026-11-06
- 83 Ill. Adm. Code Part 468, Distributed Generation Installer Certification · Illinois General Assembly, Joint Committee on Administrative Rules · checked 2026-11-06
- How to Apply for a Building Permit · Village of Skokie · checked 2026-11-06
- Building & Renovation Permits · Village of Skokie · checked 2026-11-06
Rules change. Confirm with the agency before you bid or start work. How we research