licenserules

Solar installer · Skokie, IL

Solar installer license requirements in Skokie, Illinois

Everything a solar installer needs to work legally in Skokie: the Illinois state rule and the local license. Checked November 6, 2026 from 5 official sources.

What does a solar installer need to work in Skokie?

You need two licenses: one from Illinois and one from Skokie.

1

Illinois state license · required

Distributed Generation Installer Certification

Details
2

Skokie license · required

Solar contractor registration

Skokie fee
$100
Skokie bond
None listed
Illinois bond
None listed
Insurance
Proof required

Steps to work as a solar installer in Skokie

  1. 1

    Get the Illinois Distributed Generation Installer Certification

    Since December 31, 2013, every entity that installs distributed generation (such as solar) in Illinois must be certified by the Illinois Commerce Commission before installing.3

    More

    A person installing a system on their own property for their own use without help is exempt.

    Exams, experience and state fees

  2. 2

    Get a certificate of insurance

    A certificate of insurance showing commercial general liability coverage of at least $1,000,000 per occurrence, with the Village of Skokie named as an additional insured.1

  3. 3

    Apply for your Skokie license

    $100

    Solar contractor registration: $100 solar contractor registration (general contractor fee).1 Bring the bond and insurance certificate.

    What the application needs

  4. 4

    Pull a permit for each job

    Building permit applications are filed online through the village's permit portal.45

    More

    Both the homeowner and the contractor must sign the forms, and all contractors must be licensed and bonded.

    Open the permit portal

Skokie license details

Solar contractor registration Solar installer Fee$100 Bond—

Who needs it

Solar contractors.1

What you need

  • A current electrical license from a testing community.1

Fees and bond

Solar contractor registration (general contractor fee)1$100
Bond1See source

When a project has only one contractor or no general contractor, those contractors must be registered and provide a surety bond. The registration form does not state a bond amount.

Insurance

A certificate of insurance showing commercial general liability coverage of at least $1,000,000 per occurrence, with the Village of Skokie named as an additional insured.1

Renewal

The village says many contractors must be registered and insured each year, and registration and insurance must stay current through final inspection.2

Apply on the official site

Illinois rules in short

State license

Distributed Generation Installer Certification. Full Illinois requirements

Job size limit

Since December 31, 2013, every entity that installs distributed generation (such as solar) in Illinois must be certified by the Illinois Commerce Commission before installing.3

More

A person installing a system on their own property for their own use without help is exempt.

Hiring a solar installer in Skokie?

What to ask for

A current Illinois Distributed Generation Installer Certification, the Skokie solar contractor registration, and a certificate of insurance.

Skokie contractor list Check an Illinois license

Sources

5 official pages, checked November 6, 2026
  1. Application for Contractor Registration · Village of Skokie · checked 2026-11-06
  2. Selecting a Contractor · Village of Skokie · checked 2026-11-06
  3. 83 Ill. Adm. Code Part 468, Distributed Generation Installer Certification · Illinois General Assembly, Joint Committee on Administrative Rules · checked 2026-11-06
  4. How to Apply for a Building Permit · Village of Skokie · checked 2026-11-06
  5. Building & Renovation Permits · Village of Skokie · checked 2026-11-06

Rules change. Confirm with the agency before you bid or start work. How we research