Roofer · Marysville, KS
Roofer license requirements in Marysville, Kansas
Everything a roofer needs to work legally in Marysville: the Kansas state rule and the local license. Checked November 10, 2026 from 24 official sources.
What does a roofer need to work in Marysville?
You need two licenses: one from Kansas and one from Marysville.
Marysville license · required
Builder's or building contractor's license
- Marysville fee
- $75
- Marysville bond
- None listed
- Kansas bond
- None listed
- Insurance
- Proof required
Steps to work as a roofer in Marysville
- 1
Get the Kansas Roofing Contractor Registration Certificate
Registration is not needed by a person whose roofing jobs each total less than $2,000, including labor and materials, during the fiscal year.3
More
This exemption does not apply to anyone who advertises or uses signs or cards that present them as a roofing contractor.
- 2
- 3
Apply for your Marysville license
$75Builder's or building contractor's license: $75 annual license.12 Bring the bond and insurance certificate.
- 4
Pull a permit for each job
Building permits and fees follow the city's Uniform Land Development Code.12223
More
An electrical permit and inspection are required for new construction, major remodeling or moving a structure, power that has been off six months or more, and service entrance replacement; the application is filed with the city clerk and the inspection charge is $30, plus $15 for each extra trip. The forms page says the building permit application must be filled out at City Hall.
Marysville license details
Builder's or building contractor's license General contractorResidential builderRooferConcrete contractor Fee$75 Bond—
Who needs it
Anyone who builds, alters, repairs or adds to a building or structure in the city for pay where a permit is required, who advertises or bids such work, or who builds for sale or speculation.12
More
The application lists general contracting, roofing, siding, masonry, plastering, lathing, excavating, waterproofing, metal work, foundations and cementing. Subcontractors working under a general contractor, licensed plumbers, gas fitters and electricians, and painters and similar finish workers are not included.
What you need
The license must be shown at the job site or on request of a city officer.1
Insurance
Renewal
Calendar-year license that expires December 31; renew on or before January 1.1
Kansas rules in short
State license
Roofing Contractor Registration Certificate. Full Kansas requirements
Job size limit
Registration is not needed by a person whose roofing jobs each total less than $2,000, including labor and materials, during the fiscal year.3
More
This exemption does not apply to anyone who advertises or uses signs or cards that present them as a roofing contractor.
Hiring a roofer in Marysville?
What to ask for
A current Kansas Roofing Contractor Registration Certificate, the Marysville builder's or building contractor's license, and a certificate of insurance.
Doing the work yourself
Owners may do building work on their own residence for their own use if they satisfy the building inspector of their ability, get a permit and pass inspection; only a city-licensed builder may help them.12224
More
No electrical or plumbing license is needed for work by an individual on property he or she owns.
Sources
24 official pages, checked November 10, 2026
- City Code Chapter 4, Article 1, Building Code (sections 4-101 to 4-111) · City of Marysville (published by Citycode) · checked 2026-11-10
- Application for Builder's or Building Contractor's License (PDF) · City of Marysville · checked 2026-11-10
- 50-6,129. Exemptions. · Kansas Office of Revisor of Statutes · checked 2026-11-06
- 50-6,125. Registration application requirements; refusal to register; notification. · Kansas Office of Revisor of Statutes · checked 2026-11-06
- 16-8-2 Initial application. · Kansas Secretary of State (Kansas Administrative Regulations) · checked 2026-11-06
- 16-8-6 Fees. · Kansas Secretary of State (Kansas Administrative Regulations) · checked 2026-11-06
- 50-6,131. Notification of attorney general required, when; fees. · Kansas Office of Revisor of Statutes · checked 2026-11-06
- 50-6,128. Fees; roofing contractor registration fund. · Kansas Office of Revisor of Statutes · checked 2026-11-06
- 50-6,130. Application for registration, time limit for processing. · Kansas Office of Revisor of Statutes · checked 2026-11-06
- 50-6,132. Roofing contractor registration certificate renewal; reinstatement fee. · Kansas Office of Revisor of Statutes · checked 2026-11-06
- 16-8-3 Renewal application. · Kansas Secretary of State (Kansas Administrative Regulations) · checked 2026-11-06
- 50-6,134. Nonresident roofing contractor registration requirements; agent for service of process. · Kansas Office of Revisor of Statutes · checked 2026-11-06
- 50-6,127. Duties of roofing contractor. · Kansas Office of Revisor of Statutes · checked 2026-11-06
- 50-6,135. Disclosure of roofing contractor's registration certificate number. · Kansas Office of Revisor of Statutes · checked 2026-11-06
- 50-6,121. Citation of act. · Kansas Office of Revisor of Statutes · checked 2026-11-06
- 50-6,122. Definitions. · Kansas Office of Revisor of Statutes · checked 2026-11-06
- 50-6,124. Administration of act; rules and regulations. · Kansas Office of Revisor of Statutes · checked 2026-11-06
- 50-6,123. Registration certificate required; penalties. · Kansas Office of Revisor of Statutes · checked 2026-11-06
- 50-6,138. Deceptive or unconscionable acts or practices. · Kansas Office of Revisor of Statutes · checked 2026-11-06
- 50-6,126. Criminal history record inquiry. · Kansas Office of Revisor of Statutes · checked 2026-11-06
- 50-6,136. Establishment of information system. · Kansas Office of Revisor of Statutes · checked 2026-11-06
- City Code Chapter 4, Article 3, Electrical Code · City of Marysville (published by Citycode) · checked 2026-11-10
- Forms · City of Marysville · checked 2026-11-10
- City Code Chapter 4, Article 2, Plumbing Code · City of Marysville (published by Citycode) · checked 2026-11-10
Rules change. Confirm with the agency before you bid or start work. How we research