Stillwater, MN · Local contractor rules
Contractor license requirements in Stillwater, Minnesota
What Stillwater requires before you work there, on top of Minnesota state licensing. Checked November 17, 2026 from 4 official sources.
Do I need a Stillwater license to work there?
Yes. You need one Stillwater license: the contractor's and HVAC license.
Stillwater issues a city Contractor's and HVAC License. The application lists these work types: commercial general contractors, commercial roofing, masonry/brick/tuck-point work, moving and wrecking buildings, solar panels, sign installation, waterproofing, excavating and HVAC contractors.3
The Stillwater license
Contractor's and HVAC license For: HVAC contractor, general contractor, roofer, demolition contractor, solar installer Fee$100BondNot listedThis is on top of the Minnesota state license, if your trade has one. Check your trade
Pick your trade
Find your work below. Each row shows whether you need a Minnesota state license and which Stillwater license is yours. Open a row for the full checklist.
How to start working in Stillwater
- 1
Get your Minnesota license if your trade needs one
Minnesota licenses some trades and not others. The trade list above shows the state rule for yours.
- 2
Get a certificate of insurance
Certificate of liability insurance with at least $300,000 in coverage, naming the City of Stillwater as certificate holder.3
- 3
Apply for your Stillwater license
$100Apply with City of Stillwater Building Inspections Division. Bring the bond and insurance certificate.
- 4
Pull a permit for each job
Residential permit applications that need no plan review (such as roofing, siding and windows) can be sent by fax or email; small projects such as decks and small remodels can be emailed with scaled plans.12
More
New homes and larger projects need two full-size paper plan sets plus one digital set. Commercial applications must list a licensed general contractor. Commercial plumbing and mechanical permit fees rose to 1.5% of bid plus other fees on January 1, 2026.
Stillwater license details
Contractor's and HVAC license HVAC contractorGeneral contractorRooferDemolition contractorSolar installer Fee$100 Bond—
Who needs it
What you need
Commercial contractors must provide their Minnesota contractor license, IR license or registration certificate.3
HVAC applicants must attach a copy of their Mechanical Surety Bond.3
Proof of workers' compensation coverage, or a signed statement that the applicant is not required to carry it.3
More
The applicant must give either a Social Security number or both federal and Minnesota tax ID numbers.
Fees and bond
HVAC contractors must attach a copy of their Mechanical Surety Bond. The application does not state an amount.
Insurance
Certificate of liability insurance with at least $300,000 in coverage, naming the City of Stillwater as certificate holder.3
Commercial building permit applications must list a general contractor, and that general contractor must get a city contractor license and provide a certificate of liability insurance and proof of workers' compensation.24
More
Mechanical permit applications ask for the contractor's City of Stillwater license number.
For homeowners
Can I do the work and pull the permit myself?
Stillwater does not say on the pages we read. Ask the building department before you start.
Check a contractor before you hire
Stillwater requires contractors to hold a local license or registration and insurance. Ask for a copy of each.
Good to know
Common questions
Do I need a contractor license to work in Stillwater?
Yes. Stillwater requires a contractor's and HVAC license, on top of any Minnesota license your trade needs.
How much does a Stillwater contractor license cost?
Contractor's and HVAC license: $100 (contractor's and hvac license application).
Sources
4 official pages, checked November 17, 2026
- Building Inspections · City of Stillwater · checked 2026-11-17
- Forms & Applications (Building Inspections) · City of Stillwater · checked 2026-11-17
- Contractor's and HVAC License Application (PDF) · City of Stillwater · checked 2026-11-17
- Mechanical Permit Application (PDF) · City of Stillwater · checked 2026-11-17
Rules change. Confirm with the agency before you bid or start work. How we research