licenserules

Electrician · Nebraska

Nebraska electrician license requirements

What Nebraska requires before you take paid electrical work: the license, job size limit, exams, fees, bond and insurance. Checked November 6, 2026 from 37 official sources.

Do I need a license to work as an electrician in Nebraska?

Yes. You need a state license: Electrical Contractor license (workers hold a Journeyman Electrician or Residential Journeyman Electrician license).

Issued by Nebraska State Electrical Division (State Electrical Board)34

Needed from
See limit below
Bond
None listed
Application fee, electrical contractor
$180
Exams
2
Electrician installing wiring
Job size limit

No one may wire or install electrical wiring, apparatus or equipment for another person without a license from the State Electrical Board.56

More

Only an electrical contractor (or an older Class B electrical contractor or Class A master electrician license) may plan, lay out or supervise such work for others. Workers who do the wiring must hold a journeyman, residential journeyman or fire alarm installer license and work for a licensed contractor. The Act does not give a dollar amount below which a license is not needed.

How to get licensed

  1. 1

    Register with the State Electrical Division as an apprentice electrician (no exam) and work under a licensee at the same job site. A licensee may supervise no more than three apprentices.2028

  2. 2

    After at least four years (journeyman) or three years (residential journeyman) of experience, apply for the exam online or by mail with the application fee and the U.S. citizenship attestation form.891429

  3. 3

    Wait for approval emails from the Division and from PSI, then schedule and pay for the exam with PSI within 90 days of approval.151630

  4. 4

    Pass the exam and return the State Act and Board Rules quiz.7815

    More

    The license fee depends on whether the license is issued in an even- or odd-numbered year.

  5. 5

    To become an electrical contractor, get at least one more year (2,000 hours) of experience as a licensed journeyman, apply for the electrical contractor exam ($180 application fee) and pass it.710

  6. 6

    Before operating the contracting firm, put the required liability insurance in place and register the business with the Nebraska Department of Labor.111

What Nebraska requires

Experience

Electrical contractor: at least one year (2,000 hours) of experience as a licensed journeyman electrician, or a four-year electrical engineering degree plus one year as a licensed journeyman.78910111213

More

Journeyman electrician: at least four years (8,000 hours) of verifiable experience in the trade, usually as a registered apprentice working for an electrical contractor. Residential journeyman electrician: at least three years (6,000 hours). Up to one year of credit is given for a board-approved two-year post-high school electrical course (at least 700 contact hours equals one year). A journeyman with less than 4,000 hours of experience in Nebraska gets a restricted license that cannot be used for reciprocity.

Exams 2

  • Electrical license exam (Electrical Contractor, Journeyman or Residential Journeyman)

    A written exam given by PSI at its test centers after the Division approves the exam application; there is no at-home testing.1114151617

    More

    It covers the 2023 National Electrical Code, basic electrical theory, the Nebraska State Electrical Act, and emergency and fire alarm circuits. Board rules require at least 50 questions, a passing score of 75%, and no more than three hours; applicants may use an open copy of the code. Passing the exam earns 6 hours of continuing education credit.

  • State Act and Board Rules quiz

    When the Division approves an applicant to test, it emails a short quiz on the State Electrical Act and Board Rules, to be returned after passing the exam.1516

Bond

The state does not publish a bond requirement for this work.

Liability insurance

An electrical contractor or Class A master license holder who owns and runs an electrical contracting firm must carry liability insurance of at least $100,000 per person, $300,000 per accident and $100,000 for property damage.1121

More

When several such license holders run the same firm, only one of them must carry it. The Board may revoke or refuse to renew a contractor license if this insurance is not kept in force.

Insurance rules for all Nebraska trades

Workers' compensation

The electrical contracting business must also register with the Department of Labor, which requires a workers' compensation certificate for a contractor with one or more employees.122

Renewal

All electrical licenses and apprentice registrations expire on December 31 of each even-numbered year.2324252627

More

Regular renewal runs October 1 to November 30; renewing December 1 to 31 adds a 10% late fee, and there is no grace period after December 31. A license held for the full two-year cycle needs 12 hours of board-approved continuing education, at least 6 of them on the National Electrical Code; a license held for one year of the cycle needs 6 hours. An expired license cannot be renewed: the holder must apply for and pass the exam again. Apprentices do not need continuing education to renew.

Fees

Application fee, electrical contractor718$180
Application fee, journeyman or residential journeyman electrician8918$90
Electrical contractor license fee, issued in an even-numbered year718$187.5
Electrical contractor license fee, issued in an odd-numbered year718$375
Journeyman or residential journeyman license fee, issued in an even-numbered year89$37.5
Journeyman or residential journeyman license fee, issued in an odd-numbered year89$75
Electrical contractor license, per year of the two-year period (issuance and renewal, 2025-2026)19$187.5
Journeyman, residential wireman, fire alarm or special license, per year of the two-year period (issuance and renewal, 2025-2026)19$37.5
Apprentice registration, issued in an even-numbered year1920$35
Apprentice registration, issued in an odd-numbered year20$70

Good to know

  • After failing, an applicant must apply again. After the third attempt the applicant must wait 90 days, which limits testing to three exams a year.1130

  • The Board has reciprocal agreements for the journeyman license with Alaska, Arkansas, Colorado, Iowa, Idaho, Minnesota, Montana, New Mexico, North Dakota, Oklahoma, South Dakota, Texas and Wyoming, and for the electrical contractor license with Iowa, Minnesota, South Dakota and Texas.7831

    More

    The applicant must have scored 75% or more on a state exam and held the license for at least one year.

  • A residential journeyman electrician license is valid only for one- and two-family homes and multi-family homes not over three stories. Clubhouses at multi-family complexes need a full journeyman.932

  • The Board also issues fire alarm installer licenses (two years of fire alarm experience, $90 application fee) and special electrician licenses for limited work such as irrigation, sign installation and air conditioning and refrigeration.11193334

  • Section 81-2118 sets the examination fee at $60 for each license type, while the Division's current application lists application fees of $180 (electrical contractor) and $90 (journeyman and residential journeyman). The pages checked do not explain how the two relate.1826

  • A city or county license is accepted in place of a state license for work only inside that city or county, if the local license meets the Act's requirements.35

  • A homeowner may do electrical work on his or her own single-family principal residence or farm property without a license, but not commercial, industrial or public-use installations.35

  • The licensee or owner must file a request for inspection, with fees, at or before the start of work that needs state inspection. A late request costs a $250 delinquent fee.36

  • Knowingly doing electrical work for others while claiming to hold a license one does not have, or failing to file a required inspection request, is a Class IV felony.2337

Electrician rules in Nebraska cities

Some places make electricians get a local license on top of Nebraska's. Find yours below.

Hiring an electrician in Nebraska?

What to ask for

A current Electrical Contractor license (workers hold a Journeyman Electrician or Residential Journeyman Electrician license) number, then look it up yourself.

Check a Nebraska license City rules

Common questions

Do I need a license to work as an electrician in Nebraska?

Yes. Nebraska requires Electrical Contractor license (workers hold a Journeyman Electrician or Residential Journeyman Electrician license). No one may wire or install electrical wiring, apparatus or equipment for another person without a license from the State Electrical Board. Only an electrical contractor (or an older Class B electrical contractor or Class A master electrician license) may plan, lay out or supervise such work for others. Workers who do the wiring must hold a journeyman, residential journeyman or fire alarm installer license and work for a licensed contractor. The Act does not give a dollar amount below which a license is not needed.

How much does Electrical Contractor license (workers hold a Journeyman Electrician or Residential Journeyman Electrician license) cost in Nebraska?

Application fee, electrical contractor: $180. Application fee, journeyman or residential journeyman electrician: $90. Electrical contractor license fee, issued in an even-numbered year: $187.5. Electrical contractor license fee, issued in an odd-numbered year: $375. Journeyman or residential journeyman license fee, issued in an even-numbered year: $37.5. Journeyman or residential journeyman license fee, issued in an odd-numbered year: $75. Electrical contractor license, per year of the two-year period (issuance and renewal, 2025-2026): $187.5. Journeyman, residential wireman, fire alarm or special license, per year of the two-year period (issuance and renewal, 2025-2026): $37.5. Apprentice registration, issued in an even-numbered year: $35. Apprentice registration, issued in an odd-numbered year: $70.

What exams do I need to pass?

Electrical license exam (Electrical Contractor, Journeyman or Residential Journeyman). State Act and Board Rules quiz.

How often do I renew?

All electrical licenses and apprentice registrations expire on December 31 of each even-numbered year. Regular renewal runs October 1 to November 30; renewing December 1 to 31 adds a 10% late fee, and there is no grace period after December 31. A license held for the full two-year cycle needs 12 hours of board-approved continuing education, at least 6 of them on the National Electrical Code; a license held for one year of the cycle needs 6 hours. An expired license cannot be renewed: the holder must apply for and pass the exam again. Apprentices do not need continuing education to renew.

Sources

37 official pages, checked November 6, 2026
  1. Contractor Registration - Who Needs to Register · Nebraska Department of Labor · checked November 6, 2026
  2. Contractor Registration - Search Contractors · Nebraska Department of Labor · checked November 6, 2026
  3. Welcome | Nebraska State Electrical · Nebraska State Electrical Division · checked November 6, 2026
  4. NSED Licensing & Permitting System public portal (Licensee Search) · Nebraska State Electrical Division · checked November 6, 2026
  5. Neb. Rev. Stat. 81-2106. Plan, lay out, or supervise certain activities; license required; exceptions · Nebraska Legislature · checked November 6, 2026
  6. Neb. Rev. Stat. 81-2108. Wiring or installing; license required; exceptions; lending license prohibited · Nebraska Legislature · checked November 6, 2026
  7. Electrical Contractor · Nebraska State Electrical Division · checked November 6, 2026
  8. Journeyman Electrician · Nebraska State Electrical Division · checked November 6, 2026
  9. Residential Journeyman Wireman · Nebraska State Electrical Division · checked November 6, 2026
  10. Policy Number 36: Exam applications approval requirements · Nebraska State Electrical Division · checked November 6, 2026
  11. State Electrical Board Rules (April 2024) · Nebraska State Electrical Division · checked November 6, 2026
  12. Neb. Rev. Stat. 81-2107. Electrical contractor license; applicant; qualifications · Nebraska Legislature · checked November 6, 2026
  13. Neb. Rev. Stat. 81-2109. Journeyman electrician license; residential journeyman electrician license; qualifications · Nebraska Legislature · checked November 6, 2026
  14. Exam Information and Licensing Applications · Nebraska State Electrical Division · checked November 6, 2026
  15. PSI Exams · Nebraska State Electrical Division · checked November 6, 2026
  16. Exam Scheduling · Nebraska State Electrical Division · checked November 6, 2026
  17. Neb. Rev. Stat. 81-2115. License; written examination · Nebraska Legislature · checked November 6, 2026
  18. Licensing Application (2026, updated 4.1.2026) · Nebraska State Electrical Division · checked November 6, 2026
  19. 2025-2026 License & Registration Fees · Nebraska State Electrical Division · checked November 6, 2026
  20. Apprentice Electrician · Nebraska State Electrical Division · checked November 6, 2026
  21. Neb. Rev. Stat. 81-2104. State Electrical Board; powers enumerated · Nebraska Legislature · checked November 6, 2026
  22. Neb. Rev. Stat. 48-2105. Registration; application; contents; renewal · Nebraska Legislature · checked November 6, 2026
  23. License Renewal · Nebraska State Electrical Division · checked November 6, 2026
  24. License Renewal Opens 10/01/2026 - 12/31/2026 · Nebraska State Electrical Division · checked November 6, 2026
  25. Continuing Education · Nebraska State Electrical Division · checked November 6, 2026
  26. Neb. Rev. Stat. 81-2118. Licenses and registrations; expiration; renewal, when; fees · Nebraska Legislature · checked November 6, 2026
  27. Neb. Rev. Stat. 81-2117.01. License renewal; continuing education required · Nebraska Legislature · checked November 6, 2026
  28. Neb. Rev. Stat. 81-2113. Apprentice electrician; registration; supervision; renewal; continuing education · Nebraska Legislature · checked November 6, 2026
  29. Licensing · Nebraska State Electrical Division · checked November 6, 2026
  30. Policy Number 37: Exam testing requirements (July 11, 2025) · Nebraska State Electrical Division · checked November 6, 2026
  31. Reciprocal Information · Nebraska State Electrical Division · checked November 6, 2026
  32. Neb. Rev. Stat. 81-2102. Terms, defined · Nebraska Legislature · checked November 6, 2026
  33. Fire Alarm Installer · Nebraska State Electrical Division · checked November 6, 2026
  34. Neb. Rev. Stat. 81-2112. Special electrician license; licensee; rights and privileges; qualifications · Nebraska Legislature · checked November 6, 2026
  35. Neb. Rev. Stat. 81-2121. Act; not applicable to certain situations; enumerated · Nebraska Legislature · checked November 6, 2026
  36. Neb. Rev. Stat. 81-2126. Request for inspection; when required; fees · Nebraska Legislature · checked November 6, 2026
  37. Neb. Rev. Stat. 81-2143. Violations, enumerated; penalties · Nebraska Legislature · checked November 6, 2026

Rules change. Confirm with the agency before you bid or start work. How we research

Other trades in Nebraska

Electrician licenses in other states

Birmingham, Alabama skyline by the water Alabama Electrical Contractor license; Journeyman Electrician license Snow-covered Alaska mountains reflected in water Alaska Electrician certificate of fitness (journeyman, residential wireman or trainee), plus contractor registration for the business Phoenix from above with mountains in the background Arizona R-11, C-11 or CR-11 Electrical Little Rock, Arkansas skyline at night Arkansas Master, journeyman, residential master or residential journeyman electrician license (Board of Electrical Examiners) Houses and palm trees on a California street California C-10 Electrical Contractor Denver skyline with the mountains behind it Colorado Electrical Contractor registration, with Master Electrician, Journeyman Electrician or Residential Wireman licenses for individuals New England house among green trees in Connecticut Connecticut E-1 Unlimited Electrical Contractor (E-2 Unlimited Electrical Journeyperson) Brick building among green trees in Wilmington, Delaware Delaware Master Electrician, Limited Electrician, Master/Limited Electrician Special, Residential, Journeyperson and Apprentice Electrician licenses (Board of Electrical Examiners) Row houses in Washington, DC with a flag on the porch District of Columbia Master Electrician and Electrical Contractor (Board of Industrial Trades) Suburban Florida street with palm trees Florida Certified Electrical Contractor (EC) or Registered Electrical Contractor (ER) Atlanta buildings from above Georgia Electrical Contractor Class I or Electrical Contractor Class II Honolulu buildings from above Hawaii C-13 Electrical Contractor Boise, Idaho skyline under a blue sky Idaho Electrical contractor license; master, journeyman and residential electrician licenses Chicago buildings along the river Illinois No state license. Cities or counties may license it Indianapolis skyline under a blue sky Indiana No state license. Cities or counties may license it Des Moines, Iowa buildings from above Iowa Electrical Contractor or Residential Electrical Contractor license, with Master, Journeyman and Residential electrician licenses for individuals Wichita, Kansas river and bridge from above Kansas No state license. Cities or counties may license it Louisville skyline across the Ohio River Kentucky Electrical Contractor license (needs a licensed Master Electrician); Master Electrician and Electrician licenses for individuals Yellow house with green shutters in New Orleans Louisiana Electrical classification (LSLBC contractor license) Portland Head Light on the Maine coast Maine Master, Journeyman or Limited Electrician (Electricians' Examining Board) Baltimore skyline across the harbor Maryland Master Electrician License (State Board of Electricians) Boston skyline across the harbor Massachusetts Journeyman Electrician (Certificate B) and Master Electrician (Certificate A) Detroit skyline reflected in the river at dusk Michigan Electrical Contractor License (work done by licensed Master Electricians, Electrical Journeymen and registered apprentices) Minneapolis skyline at night Minnesota Electrical contractor license (company), with personal master or journeyworker electrician licenses Downtown Jackson, Mississippi buildings Mississippi Electrical major classification (commercial) or Residential Electrical license St. Louis skyline across the Mississippi River Missouri Statewide Electrical Contractor License (optional) Montana field below the mountains Montana Residential, Journeyman or Master Electrician license; Electrical Contractor license for the business Las Vegas buildings from above Nevada C-2 Electrical Contracting Small New Hampshire town with a church steeple from above New Hampshire Journeyman Electrician or Master Electrician license Jersey City skyline across the water New Jersey Electrical Contractor License and Business Permit Adobe building in Santa Fe under a clear blue sky New Mexico EE-98 Residential, Commercial and Industrial Electrical (or ER-1 Residential Electrical) Brownstone row houses in New York New York No state license. Cities or counties may license it Charlotte, North Carolina from above North Carolina Electrical Contractor license (Limited, Intermediate or Unlimited; special restricted classes also available) North Dakota prairie under a cloudy sky North Dakota Master, Journeyman, Class B or Power Limited Electrician license (State Electrical Board) Columbus, Ohio skyline and bridge over the river Ohio Electrical Contractor (OCILB) Oklahoma City skyline by the river Oklahoma Electrical Contractor License (Unlimited, Residential or Limited) Portland, Oregon with Mount Hood behind it Oregon Electrical Contractor (C) business license, with General Supervising (S), General Journeyman (J) or Limited Residential (LR) electrician licenses for individuals Philadelphia skyline at dusk Pennsylvania No state license. Cities or counties may license it Providence, Rhode Island skyline Rhode Island Electrical Contractor (Certificate A) and Journeyperson Electrician (Certificate B) Historic street in Charleston, South Carolina South Carolina Residential Electrician license (Residential Builders Commission); Mechanical Contractor license, Electrical classification (Contractor's Licensing Board) Path and bridge in Sioux Falls, South Dakota South Dakota Electrical Contractor, Class B Electrician or Journeyman Electrician license (South Dakota Electrical Commission) Nashville skyline by the river at sunset Tennessee Contractor license with CE Electrical classification ($25,000 and up); Limited Licensed Electrician (LLE) (under $25,000) Brick two-story house in Texas Texas Electrical Contractor (business), with Master Electrician, Journeyman Electrician and other individual licenses Salt Lake City skyline below the mountains Utah E200 General Electrical Contractor (E201 Residential Electrical Contractor), qualified by a Master or Residential Master Electrician Richmond, Virginia skyline and bridge at night Virginia Class A, B or C contractor license with the Electrical (ELE) classification, qualified by a Master Electrician tradesman license Seattle skyline with Mount Rainier behind it Washington Electrical contractor license, with journey level or specialty electrician certificates and an assigned master electrician or electrical administrator West Virginia town surrounded by trees West Virginia Electrical Contractor license (Contractor Licensing Board); Master, Journeyman or Specialty Electrician license (State Fire Marshal) Milwaukee skyline across the water Wisconsin Electrical Contractor license (business), with Master Electrician and Journeyman Electrician licenses (individuals) Wyoming lake and snow-capped mountains Wyoming Electrical Contractor, Master Electrician or Journeyman Electrician license