Decatur, IL · Local contractor rules
Contractor license requirements in Decatur, Illinois
What Decatur requires before you work there, on top of Illinois state licensing. Checked November 6, 2026 from 5 official sources.
Decatur has 2 license types. You need only the one that fits your work:
Electrical contractor license For: Electrician Fee$100BondNot listed Heating, air conditioning and refrigeration contractor and mechanic licenses For: HVAC contractor Fee$100BondNot listedThis is on top of the Illinois state license, if your trade has one. Check your trade
Pick your trade
Find your work below. Each row shows whether you need an Illinois state license and which Decatur license is yours. Open a row for the full checklist.
The city says plumbing and roofing contractors must be licensed by the State of Illinois.4
More
The city's homeowner guide does not list a city license for general contractors.
How to start working in Decatur
- 1
Get your Illinois license if your trade needs one
Illinois licenses some trades and not others. The trade list above shows the state rule for yours.
- 2
Get a certificate of insurance
The minimums depend on which license you get. They are listed in each license below.
- 3
Apply for your Decatur license
$100Apply for the one that fits your work, with City of Decatur Economic and Community Development Department, Building Inspections Division. Each costs $100.
- 4
- 5
Renew on time
Licenses run January 1 through December 31 and the fee is due before February 1.
More
Renewal needs no new exam. A license not renewed for one year or more must be applied for as new.
Details for each Decatur license type
You need only one of these: the one that fits your work.
Electrical contractor license Electrician Fee$100 Bond—
Who needs it
Any person or company in the business of installing, altering or servicing electrical equipment in the city.2
More
All electrical work must be done by a licensed electrical contractor or its employees, except for qualifying owner-occupants.
What you need
An application to the Building Inspections Division naming a Supervising Electrician employed by the contractor, who is responsible for all work under the contractor's permits.2
The Supervising Electrician must be a licensed professional electrical engineer or have at least four years of verifiable experience under a licensed electrician or electrical contractor, and must pass the International Code Council Master Electrician exam.2
If the Supervising Electrician leaves, the contractor must name a qualified replacement within 10 days.2
Fees and bond
Renewal
Licenses run January 1 through December 31 and the fee is due before February 1.2
More
Renewal needs no new exam. A license not renewed for one year or more must be applied for as new.
Heating, air conditioning and refrigeration contractor and mechanic licenses HVAC contractor Fee$100 Bond—
Who needs it
Companies that install, alter or service heating, air conditioning, ventilation or refrigeration systems need a contractor license.3
More
Individuals who do or supervise that work need a mechanic license, unless they work under a licensed mechanic's supervision.
What you need
A contractor must employ at least one licensed mechanic in a supervisory or administrative role.3
Mechanics must be at least 21, pass the ICC Standard Master Mechanical exam, and be a registered professional engineer, have at least four years of experience, or have finished a course in the subject plus one year of experience.3
A mechanic licensed through comparable testing in another Illinois municipality may work in Decatur without another license if employed by, or licensed as, a Decatur contractor.3
Insurance
Contractor applicants must show liability insurance of $500,000 general aggregate.3
Renewal
Licenses run October 1 through September 30. A mechanic license can be renewed without a new exam if the renewal and fee reach the Finance Department before November 1 after expiration.3
More
A qualifying contractor who also qualifies as a mechanic gets both licenses for one fee.
A contractor cannot get a permit unless its license is in good standing.4
For homeowners
Can I do the work and pull the permit myself?
A homeowner may get a permit only for work on their own primary residence that they own and live in, not a rental or a home they do not live in.24
More
For electrical work, an owner-occupant of a single-family home must pass a written test with a score of 70% and live in the home for at least six months after the work.
Check a contractor before you hire
Decatur requires contractors to hold one of the local licenses above and insurance. Ask for a copy of each.
Good to know
Common questions
Do I need a contractor license to work in Decatur?
Only for some trades: electrician and HVAC contractor. Other trades need no Decatur license, only any Illinois license the trade requires.
How much does a Decatur contractor license cost?
It depends on the license type. Electrical contractor license: $100 (annual license fee). Heating, air conditioning and refrigeration contractor and mechanic licenses: $100 (annual contractor license fee).
Can a homeowner pull a permit in Decatur?
A homeowner may get a permit only for work on their own primary residence that they own and live in, not a rental or a home they do not live in. For electrical work, an owner-occupant of a single-family home must pass a written test with a score of 70% and live in the home for at least six months after the work.
How long is a Decatur contractor license good for?
Licenses run January 1 through December 31 and the fee is due before February 1. Renewal needs no new exam. A license not renewed for one year or more must be applied for as new.
Sources
5 official pages, checked November 6, 2026
- Building Permits · City of Decatur · checked 2026-11-06
- City Code Chapter 25: Electrical Commission and Licensed Electrical Contractors (revised 04/2022) · City of Decatur · checked 2026-11-06
- City Code Chapter 26: Heating, Air Conditioning and Refrigeration Contractors (amended December 2023) · City of Decatur · checked 2026-11-06
- Homeowner Permit Process (08/2024) · City of Decatur Building Inspections Division · checked 2026-11-06
- License Application Forms · City of Decatur · checked 2026-11-06
Rules change. Confirm with the agency before you bid or start work. How we research