River Grove, IL · Local contractor rules
Contractor license requirements in River Grove, Illinois
What River Grove requires before you work there, on top of Illinois state licensing. Checked November 6, 2026 from 5 official sources.
The River Grove license
Contractor's license For: General contractor, residential builder, electrician, roofer, plumber Fee$150Bond$10,000This is on top of the Illinois state license, if your trade has one. Check your trade
Pick your trade
Find your work below. Each row shows whether you need an Illinois state license and which River Grove license is yours. Open a row for the full checklist.
The village says any contractor who wants to do business in River Grove must be licensed by the village.2
How to start working in River Grove
- 1
Get your Illinois license if your trade needs one
Illinois licenses some trades and not others. The trade list above shows the state rule for yours.
- 2
Get a surety bond
$10,000River Grove requires a $10,000 bond.13 You pay a yearly premium to a surety company, not the full amount. Estimate the cost
- 3
- 4
Apply for your River Grove license
$150Apply with Village of River Grove Building Department. Bring the bond and insurance certificate.
- 5
Pull a permit for each job
Remodeling work valued at over $100 needs a building permit, and the permit fee is based on the scope of the project.24
More
The building permit application asks for property owner and contractor information, and contracts or receipts are required for all projects. The village publishes separate permit applications for building, demolition, electrical, mechanical, plumbing, roofing, concrete, fence, sign and dumpster work.
- 6
Renew on time
The license is valid until December 31 of each year, regardless of when the application is submitted.
More
The fee is not refunded if the applicant cancels or withdraws the application.
River Grove license details
Contractor's license General contractorResidential builderElectricianRooferPlumber Fee$150 Bond$10,000
Who needs it
What you need
Fees and bond
A $10,000 license and permit bond that is specific to the trade, with the Village of River Grove named as obligee, valid for the whole license period. Plumbers do not need a bond.
Insurance
Renewal
The contractor's license costs $150 for a general contractor and $125 for a subcontractor, and needs a $10,000 trade-specific license and permit bond (plumbers are exempt from the bond).3
For homeowners
Can I do the work and pull the permit myself?
The permit application says contractors or homeowners are responsible for scheduling all required inspections. The pages read do not state other homeowner permit rules.4
Check a contractor before you hire
River Grove requires contractors to hold a local license or registration and a bond and insurance. Ask for a copy of each.
Good to know
Common questions
Do I need a contractor license to work in River Grove?
Yes. River Grove requires a contractor's license, on top of any Illinois license your trade needs.
How much does a River Grove contractor license cost?
Contractor's license: $150 (general contractor license).
Do River Grove contractors need a bond?
Yes. Contractor's license: $10,000 bond.
Can a homeowner pull a permit in River Grove?
The permit application says contractors or homeowners are responsible for scheduling all required inspections. The pages read do not state other homeowner permit rules.
How long is a River Grove contractor license good for?
The license is valid until December 31 of each year, regardless of when the application is submitted. The fee is not refunded if the applicant cancels or withdraws the application.
Sources
5 official pages, checked November 6, 2026
- Contractor's License · Village of River Grove · checked 2026-11-06
- Building Permits · Village of River Grove · checked 2026-11-06
- Contractor's License Application (revised 9/12/2025) · Village of River Grove · checked 2026-11-06
- Building Permit Application (revised 9/12/2025) · Village of River Grove · checked 2026-11-06
- Applications & Permits · Village of River Grove · checked 2026-11-06
Rules change. Confirm with the agency before you bid or start work. How we research