Oakley, KS · Local contractor rules
Contractor license requirements in Oakley, Kansas
What Oakley requires before you work there, on top of Kansas state licensing. Checked November 10, 2026 from 7 official sources.
Oakley has 2 license types. You need only the one that fits your work:
Electric license For: Electrician Fee$25BondNot listed Plumbing license and gas fitting license For: Plumber Fee$25BondNot listedThis is on top of the Kansas state license, if your trade has one. Check your trade
Pick your trade
Find your work below. Each row shows whether you need a Kansas state license and which Oakley license is yours. Open a row for the full checklist.
How to start working in Oakley
- 1
Get your Kansas license if your trade needs one
Kansas licenses some trades and not others. The trade list above shows the state rule for yours.
- 2
- 3
Apply for your Oakley license
$25Apply for the one that fits your work, with City of Oakley City Office. Each costs $25.
- 4
Pull a permit for each job
Building permit applications are available at the City Office and are approved by the City Building Inspector; no new construction is allowed without a permit.457
More
Building permits are needed for additions, commercial construction, external alterations, fences, garages, homes, sheds and signs, and for moving a building or shed into the city, but not for putting siding on a home. Building permit fees run from $10 (120 to 400 square feet) to $120 (2,400 square feet and over); plumbing and electrical permit fees run from $10 to $40. Underground sprinkler installations need an application and inspections.
- 5
Renew on time
The license runs for twelve months and is renewed with each policy period of the liability insurance.
Details for each Oakley license type
You need only one of these: the one that fits your work.
Electric license Electrician Fee$25 Bond—
Who needs it
Anyone who wants electrical permits in the city. A firm or corporation may be licensed when one or more members or employees hold an electrician's license.2
What you need
Renewal
Plumbing license and gas fitting license Plumber Fee$25 Bond—
Who needs it
Anyone in the business of plumbing or doing plumbing or gas fitting work in the city.3
More
A firm or corporation may be licensed when one or more members or employees are licensed.
What you need
Apply in writing to the city clerk, under oath, listing training and experience.13
More
A plumbing code test (or a gas fitting code test for the gas fitting license) must be passed; the utilities director may also ask for a practical demonstration. A certificate or license from a Kansas city of over 5,000 people may be accepted.
Renewal
For homeowners
Check a contractor before you hire
Oakley requires contractors to hold one of the local licenses above and insurance. Ask for a copy of each.
Good to know
No plumbing permit or license is needed for minor repairs such as fixing leaks, clearing stoppages or replacing fixtures without disturbing waste or supply pipes.3
Common questions
Do I need a contractor license to work in Oakley?
Only for some trades: electrician and plumber. Other trades need no Oakley license, only any Kansas license the trade requires.
How much does a Oakley contractor license cost?
It depends on the license type. Electric license: $25 (electric license). Plumbing license and gas fitting license: $25 (plumbing license).
Can a homeowner pull a permit in Oakley?
Owners doing electrical or plumbing work on their own property may get permits in their own names without filing insurance, but anyone helping them must be licensed and insured.
How long is a Oakley contractor license good for?
The license runs for twelve months and is renewed with each policy period of the liability insurance.
Sources
7 official pages, checked November 10, 2026
- Licenses · City of Oakley · checked 2026-11-10
- City Code Chapter IV, Article 2, Electrical Code · City of Oakley (published by Citycode) · checked 2026-11-10
- City Code Chapter IV, Article 3, Plumbing Code · City of Oakley (published by Citycode) · checked 2026-11-10
- Building Permits · City of Oakley · checked 2026-11-10
- City Code Chapter IV, Article 1, Building Code · City of Oakley (published by Citycode) · checked 2026-11-10
- Application for Building Permit 2026 (PDF) · City of Oakley · checked 2026-11-10
- Permit Fees · City of Oakley · checked 2026-11-10
Rules change. Confirm with the agency before you bid or start work. How we research