licenserules

Cleveland, TN · Local contractor rules

Contractor license requirements in Cleveland, Tennessee

What Cleveland requires before you work there, on top of Tennessee state licensing. Checked November 7, 2026 from 4 official sources.

Do I need a Cleveland license to work there?

Yes. You need one Cleveland license. Which one depends on the work you do.

Cleveland requires a city license, obtained before buying a permit, for any electrical, mechanical or plumbing work, and for any work by a commercial contractor who is not state licensed (work under $25,000).1

This is on top of the Tennessee state license, if your trade has one. Check your trade

Pick your trade

Find your work below. Each row shows whether you need a Tennessee state license and which Cleveland license is yours. Open a row for the full checklist.

Trades without a Cleveland license

A licensed contractor is not required for residential work under $3,000.1

More

Residential remodeling from $3,000 to under $25,000 needs a state Home Improvement license. A licensed mechanical contractor is not required for jobs under $25,000.

How to start working in Cleveland

  1. 1

    Get your Tennessee license if your trade needs one

    Tennessee licenses some trades and not others. The trade list above shows the state rule for yours.

  2. 2

    Apply for your Cleveland license

    Apply for the one that fits your work, with City of Cleveland Development & Engineering Services, Building Division.

    • City electrical licenseNot published
    • City plumbing license$75
    • City mechanical license$75
    • City license for commercial contractors without a state licenseNot published

    What each license needs

  3. 3

    Pull a permit for each job

    A licensed contractor must obtain the permit for their own field.1

    More

    Electrical, mechanical and plumbing contractors must hold a city license before buying a permit. Applications are made through the city's self-service portal.

    Open the Cleveland permit portal

  4. 4

    Renew on time

    The city license period runs from April 1 to March 31. The renewal form and fee are due by December 31.

Details for each Cleveland license type

You need only one of these: the one that fits your work.

City electrical license Electrician Fee— Bond—

Who needs it

Anyone doing electrical work must obtain a license with the city before buying a permit.1

What you need

  • Apply through the city's online self-service portal.1

Apply on the official site
City plumbing license Plumber Fee$75 Bond—

Who needs it

Anyone doing plumbing work must obtain a license with the city before buying a permit.12

More

The city form lists master plumber, limited license plumber, and sewer and water line licenses.

What you need

  • A valid State of Tennessee license is required to obtain a City of Cleveland plumbing license.2

    More

    The form asks for the state master plumber or limited license plumber number.

Fees and bond

Master plumber (city form dated 2012)2$75
Limited license plumber (city form dated 2012)2$50
Sewer and water line (city form dated 2012)2$50

Renewal

The city license period runs from April 1 to March 31. The renewal form and fee are due by December 31.2

Apply on the official site
City mechanical license HVAC contractor Fee$75 Bond—

Who needs it

Anyone doing mechanical work must obtain a license with the city before buying a permit.1

What you need

  • A valid State of Tennessee license is required to obtain a City of Cleveland mechanical license.3

Fees and bond

Mechanical license (city form dated 2012)3$75

Renewal

The city license period runs from April 1 to March 31. The renewal form and fee are due by December 31.3

Apply on the official site
City license for commercial contractors without a state license General contractor Fee— Bond—

Who needs it

A commercial contractor who is not state licensed, doing work under $25,000, must obtain a license with the city before buying a permit.1

What you need

  • Apply through the city's online self-service portal. Proof of Tennessee workers' compensation may still be required for commercial jobs under $25,000.1

Apply on the official site
  • To receive a permit, a licensed contractor must obtain the permit for their own field, except in the cases the city lists (homeowners, small residential jobs and commercial jobs under $25,000).1

  • City license applications are made through the city's online self-service portal.1

For homeowners

Can I do the work and pull the permit myself?

A homeowner can act as the contractor on property they own and live in without a license, after signing the Homeowner-Building Permit Affidavit.14

More

The homeowner may do their own electrical, plumbing, mechanical and gas work with the required permits. Anyone the homeowner pays for that trade work must be licensed by the State of Tennessee and through the City of Cleveland and must get a separate permit in their own name.

Check a contractor before you hire

Cleveland requires contractors to hold one of the local licenses above. Ask for a copy of each.

Check a Tennessee license

Good to know

  • The plumbing and mechanical license fees come from city application/renewal forms dated 2012 that are still posted on the city site. The licensing page itself does not list fees.123

  • No city electrical license form or electrical license fee was found on the city site.1

Common questions

Do I need a contractor license to work in Cleveland?

Yes. Cleveland has 4 license types (City electrical license; City plumbing license; City mechanical license; City license for commercial contractors without a state license). You need the one that fits your work, plus any Tennessee license your trade needs.

How much does a Cleveland contractor license cost?

It depends on the license type. City plumbing license: $75 (master plumber (city form dated 2012)). City mechanical license: $75 (mechanical license (city form dated 2012)).

Can a homeowner pull a permit in Cleveland?

A homeowner can act as the contractor on property they own and live in without a license, after signing the Homeowner-Building Permit Affidavit. The homeowner may do their own electrical, plumbing, mechanical and gas work with the required permits. Anyone the homeowner pays for that trade work must be licensed by the State of Tennessee and through the City of Cleveland and must get a separate permit in their own name.

How long is a Cleveland contractor license good for?

The city license period runs from April 1 to March 31. The renewal form and fee are due by December 31.

Sources

4 official pages, checked November 7, 2026
  1. Contractor Licensing Requirements · City of Cleveland, Development & Engineering Services · checked 2026-11-07
  2. Plumbing License Application/Renewal Form · City of Cleveland, Development & Engineering Services · checked 2026-11-07
  3. Mechanical License Application/Renewal Form · City of Cleveland, Development & Engineering Services · checked 2026-11-07
  4. Homeowner-Building Permit Affidavit · City of Cleveland, Development & Engineering Services · checked 2026-11-07

Rules change. Confirm with the agency before you bid or start work. How we research

Other places in Tennessee